Swansea University
Comcen recently began a classroom refurbishment program at Swansea University. Using Extron MLC control panels, Comcen were able to program all inputs sources as required by the University.
The lectern specification required the Swansea University logo to be rendered onto the front panel which Comcen effortlessly arranged with our supplier. The lectern design allowed Comcen to mount the control panel within the lectern housing unit giving a high quality smooth finish.
As the rooms were only available during certain periods, Comcen designed an installation timetable which allowed the Extron programming and configuration to be completed off site orior to the successful onsite installation.